The Measure of Clean Air.

REFERENCE PROJECT · Foundry

Shanghai · Melting furnaces, pouring and cooling, electric-furnace fume

Airflow
10,000 m³/h
Completed
2020
System
Single-stage central dust-collection system

Project facts

This project treats melting furnaces, pouring and cooling, electric-furnace fume with a single-stage central dust-collection system. Design airflow is 10,000 m³/h; the system was completed in 2020.

LocationShanghai
IndustryFoundry
ProcessMelting furnaces, pouring and cooling, electric-furnace fume
Airflow10,000 m³/h
System routeSingle-stage central dust-collection system
Completed2020
Project no.C19