REFERENCE PROJECT · Electronics, Electrical & Semiconductors
Dalian, Liaoning · Oil fume at an electric-motor plant
- Airflow
- 65,000 m³/h
- Completed
- 2021
- System
- Central system: pre-filter + two-stage electrostatic
Project facts
This project treats oil fume at an electric-motor plant with a central system: pre-filter + two-stage electrostatic. Design airflow is 65,000 m³/h; the system was completed in 2021.
| Location | Dalian, Liaoning |
|---|---|
| Industry | Electronics, Electrical & Semiconductors |
| Process | Oil fume at an electric-motor plant |
| Airflow | 65,000 m³/h |
| System route | Central system: pre-filter + two-stage electrostatic |
| Completed | 2021 |
| Project no. | C62 |