REFERENCE PROJECT · Heat Treatment & Surface Finishing
Yantai, Shandong · Heat-treatment fume
- Airflow
- 10,000 m³/h
- Completed
- 2020
- System
- Central system: pre-filter + two-stage electrostatic
Project facts
This project treats heat-treatment fume with a central system: pre-filter + two-stage electrostatic. Design airflow is 10,000 m³/h; the system was completed in 2020.
| Location | Yantai, Shandong |
|---|---|
| Industry | Heat Treatment & Surface Finishing |
| Process | Heat-treatment fume |
| Airflow | 10,000 m³/h |
| System route | Central system: pre-filter + two-stage electrostatic |
| Completed | 2020 |
| Project no. | C60 |
Want more on this project? We are happy to walk you through it.