REFERENCE PROJECT · Heat Treatment & Surface Finishing

Shenyang, Liaoning · Heat-treatment fume

Airflow
15,000 m³/h
Completed
2023
System
Central system: pre-filter + two-stage electrostatic

Project facts

This project treats heat-treatment fume with a central system: pre-filter + two-stage electrostatic. Design airflow is 15,000 m³/h; the system was completed in 2023.

LocationShenyang, Liaoning
IndustryHeat Treatment & Surface Finishing
ProcessHeat-treatment fume
Airflow15,000 m³/h
System routeCentral system: pre-filter + two-stage electrostatic
Completed2023
Project no.C58

Want more on this project? We are happy to walk you through it.