The Measure of Clean Air.

REFERENCE PROJECT · Rubber, Plastics & Composites

Henan · Oil fume from extruders

Airflow
10,000 m³/h
Completed
2021
System
Pre-treatment + two-stage electrostatic system

Project facts

This project treats oil fume from extruders with a pre-treatment + two-stage electrostatic system. Design airflow is 10,000 m³/h; the system was completed in 2021.

LocationHenan
IndustryRubber, Plastics & Composites
ProcessOil fume from extruders
Airflow10,000 m³/h
System routePre-treatment + two-stage electrostatic system
Completed2021
Project no.C55