The Measure of Clean Air.

REFERENCE PROJECT · Construction & Heavy Machinery

Shandong · Welding fume on production lines

Airflow
50,000 m³/h
Completed
2021
System
Single-stage central dust-collection system

Project facts

This project treats welding fume on production lines with a single-stage central dust-collection system. Design airflow is 50,000 m³/h; the system was completed in 2021.

LocationShandong
IndustryConstruction & Heavy Machinery
ProcessWelding fume on production lines
Airflow50,000 m³/h
System routeSingle-stage central dust-collection system
Completed2021
Project no.C36

Want more on this project? We are happy to walk you through it.