REFERENCE PROJECT · Metal Fabrication
Guangdong · Shot blasting of container steel plate
- Airflow
- 32,000 m³/h
- Completed
- 2020
- System
- Two-stage central system with fire suppression, explosion venting, level detection and temperature control
Project facts
This project treats shot blasting of container steel plate with a two-stage central system with fire suppression, explosion venting, level detection and temperature control. Design airflow is 32,000 m³/h; the system was completed in 2020.
| Location | Guangdong |
|---|---|
| Industry | Metal Fabrication |
| Process | Shot blasting of container steel plate |
| Airflow | 32,000 m³/h |
| System route | Two-stage central system with fire suppression, explosion venting, level detection and temperature control |
| Completed | 2020 |
| Project no. | C26 |
Want more on this project? We are happy to walk you through it.
Similar duties
Have a similar process?
Discuss a similar project →