REFERENCE PROJECT · Metal Fabrication
Shanghai · Sheet-metal grinding rooms, body-welding booths and manual welding booths
- Airflow
- 30,000 m³/h
- Completed
- 2021
- System
- Single-stage central dust-collection system
Project facts
This project treats sheet-metal grinding rooms, body-welding booths and manual welding booths with a single-stage central dust-collection system. Design airflow is 30,000 m³/h; the system was completed in 2021.
| Location | Shanghai |
|---|---|
| Industry | Metal Fabrication |
| Process | Sheet-metal grinding rooms, body-welding booths and manual welding booths |
| Airflow | 30,000 m³/h |
| System route | Single-stage central dust-collection system |
| Completed | 2021 |
| Project no. | C25 |
Want more on this project? We are happy to walk you through it.