REFERENCE PROJECT · Metal Fabrication

Shanghai · Sheet-metal grinding rooms, body-welding booths and manual welding booths

Airflow
30,000 m³/h
Completed
2021
System
Single-stage central dust-collection system

Project facts

This project treats sheet-metal grinding rooms, body-welding booths and manual welding booths with a single-stage central dust-collection system. Design airflow is 30,000 m³/h; the system was completed in 2021.

LocationShanghai
IndustryMetal Fabrication
ProcessSheet-metal grinding rooms, body-welding booths and manual welding booths
Airflow30,000 m³/h
System routeSingle-stage central dust-collection system
Completed2021
Project no.C25