REFERENCE PROJECT · Construction & Heavy Machinery
Sichuan · Oily welding fume
- Airflow
- 10,000 m³/h
- Completed
- 2023
- System
- Central system: pre-filter + two-stage electrostatic
Project facts
This project treats oily welding fume with a central system: pre-filter + two-stage electrostatic. Design airflow is 10,000 m³/h; the system was completed in 2023.
| Location | Sichuan |
|---|---|
| Industry | Construction & Heavy Machinery |
| Process | Oily welding fume |
| Airflow | 10,000 m³/h |
| System route | Central system: pre-filter + two-stage electrostatic |
| Completed | 2023 |
| Project no. | C57 |