The Measure of Clean Air.

REFERENCE PROJECT · Rail, Shipbuilding & Aerospace

Hunan · Aero-engine machining mist and odour

Airflow
60,000 m³/h
Completed
2020
System
Pre-treatment + two-stage electrostatic system

Project facts

This project treats aero-engine machining mist and odour with a pre-treatment + two-stage electrostatic system. Design airflow is 60,000 m³/h; the system was completed in 2020.

LocationHunan
IndustryRail, Shipbuilding & Aerospace
ProcessAero-engine machining mist and odour
Airflow60,000 m³/h
System routePre-treatment + two-stage electrostatic system
Completed2020
Project no.C52