Jining, Shandong · Dust on a mine-roof-support production line
- Airflow
- 10,000 m³/h
- Completed
- 2023
- System
- Single-stage central dust-collection system
Project facts
This project treats dust on a mine-roof-support production line with a single-stage central dust-collection system. Design airflow is 10,000 m³/h; the system was completed in 2023.
| Location | Jining, Shandong |
|---|---|
| Industry | Construction & Heavy Machinery |
| Process | Dust on a mine-roof-support production line |
| Airflow | 10,000 m³/h |
| System route | Single-stage central dust-collection system |
| Completed | 2023 |
| Project no. | C21 |