REFERENCE PROJECT · Lithium Batteries & New-Energy Materials
Shanghai · Oil fume from separator production
- Airflow
- 3,000 m³/h
- Completed
- 2021
- System
- Pre-treatment + two-stage electrostatic system
Project facts
This project treats oil fume from separator production with a pre-treatment + two-stage electrostatic system. Design airflow is 3,000 m³/h; the system was completed in 2021.
| Location | Shanghai |
|---|---|
| Industry | Lithium Batteries & New-Energy Materials |
| Process | Oil fume from separator production |
| Airflow | 3,000 m³/h |
| System route | Pre-treatment + two-stage electrostatic system |
| Completed | 2021 |
| Project no. | C04 |