The Measure of Clean Air.

REFERENCE PROJECT · Lithium Batteries & New-Energy Materials

Shanghai · Oil fume from separator production

Airflow
3,000 m³/h
Completed
2021
System
Pre-treatment + two-stage electrostatic system

Project facts

This project treats oil fume from separator production with a pre-treatment + two-stage electrostatic system. Design airflow is 3,000 m³/h; the system was completed in 2021.

LocationShanghai
IndustryLithium Batteries & New-Energy Materials
ProcessOil fume from separator production
Airflow3,000 m³/h
System routePre-treatment + two-stage electrostatic system
Completed2021
Project no.C04

Want more on this project? We are happy to walk you through it.

Similar duties

Have a similar process?

Discuss a similar project →