GB 9448—2025: connect extraction to welding and cutting work

GB 9448—2025 took effect on 1 August 2026. Organize ventilation, operator position, protection, hot work and training as one workstation task.

Request a Technical Assessment
01

Choose capture around the operation

Manual welding needs reachable hoods that follow the work. Robotic cells need enclosure and door/loading sequences; cutting tables need plenum, zoning and hot-particle paths. Map source, people and air direction before discussing the collector.

02

Materials determine additional measures

Record base metal, consumables, coatings and cleaners and establish additional ventilation or protection for the actual operation. Allocate cleaning, gas-supply and welding interfaces to their owners; a clear generation path helps locate capture.

03

Include people and task movements in validation

Check positions during welding, part changes, teaching and cleaning. Validate ventilation with work protection, then have operators demonstrate positioning, start/stop, abnormal reporting and restart conditions on the actual equipment.

04

Keep confined-space and laser tasks distinct

Confined-space work needs its own testing, ventilation, attendant and rescue arrangements. Laser and handheld-laser duties also require suitable optical protection, guarding and training coordinated with fume extraction.

Bring five inputs to selection
Provide process/material, source layout/work size, operator/robot movements, concurrent work and existing duct/control conditions. SCS arm arrangements are a starting point for moving manual welds; fixed cells, tables and multi-station duties start from their capture interfaces when considering SCU or a central system.
Connect equipment and work requirements in procurement
Review welding-fume capture and separation equipment against the applicable GB/T 43917.1 requirements, matching documents to configuration, test conditions and supply scope. After installation, validate capture with the actual welding program, opening states and operator locations.