What to Check When Equipment Arrives

On delivery day, check model, quantity, accessories and documents against the packing list and contract, inspect for transport damage, and photograph and note any problem on the delivery receipt.

Request a Technical Assessment
Equipment progressing through transport, unpacking, ground-level installation and instrumented verification with a guarded inlet.
Record transport, unpacking, installation and performance verification separately. Open full diagram ↗

What to check

  • Packing: damage, moisture, tipping.
  • Model and quantity: nameplate matches the contract; crate count matches the packing list.
  • Accessories: cartridges or bags, control panel, pulse valves, gauge, arms, hoses, fasteners.
  • Appearance: housing, doors and flanges free of distortion, paint damage and dents.
  • Documents: manual, certificate, inspection record, wiring diagrams.

If something is wrong

Take photos, including the packing and nameplate, note it on the delivery receipt and tell us the same day. We arrange replacement of missing or damaged parts.

After delivery

The delivery check only confirms the goods are right and undamaged. Installation checks and performance acceptance come later: a pre-start checklist after installation, then airflow, pressure drop and capture checks during commissioning, and acceptance per the contract.