The Measure of Clean Air.

CASE STUDY

350,000 m³/h central extraction for a welding line

A multi-station welding line uses central extraction and filtration. The project record states 350,000 m³/h, a design outlet target below 5 mg/Nm³ and nanomembrane/flame-retardant media.

Start with duty and result basis

Project profile

ItemRecorded information
SectorAutomotive welding
LocationProject location not disclosed
DutyWelding fume from multiple workstations
Equipment routeCentral cartridge collection; original model not disclosed
System airflow350,000 m³/h
Design targetParticulate outlet target <5 mg/Nm³
MediaNanomembrane plus flame-retardant media

Connect multiple weld stations as one system

A welding shop combines many sources with changing workpiece and robot movements. Central extraction connects capture points, branches, headers, cleaning and discharge into a maintainable system. The project airflow describes system scale; distribution to workstations follows enclosure, hood and concurrent-operation requirements.

The original record specifies nanomembrane and flame-retardant media. Similar projects should compare the media, loading, cleaning, hot-particle conditions and access, with dust removal and replacement space included in the layout.

Use the design flow and outlet target

The two figures describe system scale and the design outlet target. Commissioning and later operation are compared on the same production mix, branches and measurement methods.

For robotic cells, assembly stations and manual rework, first list capture points and operating combinations, then compare central cartridge families.