REFERENCE PROJECT · Automotive & Components
Hubei · Emulsion mist from diesel-engine block machining
- Airflow
- 12,000 m³/h
- Completed
- 2020
- System
- Central system: pre-filter + two-stage electrostatic
Project facts
This project treats emulsion mist from diesel-engine block machining with a central system: pre-filter + two-stage electrostatic. Design airflow is 12,000 m³/h; the system was completed in 2020.
| Location | Hubei |
|---|---|
| Industry | Automotive & Components |
| Process | Emulsion mist from diesel-engine block machining |
| Airflow | 12,000 m³/h |
| System route | Central system: pre-filter + two-stage electrostatic |
| Completed | 2020 |
| Project no. | C61 |