The Measure of Clean Air.

TECHNICAL ARCHIVE

Coking air-emission standard: separate air control from other environmental tasks

GB 16171.1—2024 specifically addresses air emissions from coking chemical operations, with different implementation arrangements for new and existing facilities.

Send your duty, get a proposal
01

Document and process context

GB 16171.1—2024, the air-pollutant emission standard for the coking chemical industry, was jointly issued by the Ministry of Ecology and Environment and the national market regulator. It addresses air-emission control, monitoring and regulatory management for the specified industry. The announcement states that it is mandatory.

The announcement sets 1 April 2025 for new facilities and 1 January 2027 for existing facilities to apply the new air-emission requirements, replacing the relevant provisions of GB 16171—2012. A facility reviewing the transition should connect its category, applicable date and emission activities, rather than turning the two dates into one universal deadline.

The scope also explains interfaces with other environmental tasks: water pollutants, noise and odorous pollutants not addressed by this standard follow corresponding standards, while solid waste has its own controls. Environmental planning for a coking project therefore requires separate system boundaries.

Air-control equipment must be matched to process sources, capture arrangements and actual gas conditions, without substituting for assessments of other systems.

02

Advice for factories

List gas sources, capture and treatment routes, test information and applicable standards by facility, keeping wastewater, noise and solid-waste records separate. Before upgrade discussions, confirm the facility category and relevant provisions, then define responsibilities for design, construction, monitoring and operation.

NEXT STEP

Send your duty, get a proposal

Continue