The Measure of Clean Air.

TECHNICAL ARCHIVE

Outlet monitoring points: include sampling access in upgrade planning

HJ 1405—2024 addresses monitoring points at air-emission and wastewater outlets. The announcement sets 1 January 2027 as its implementation date.

Send your duty, get a proposal
01

Document and process context

HJ 1405—2024 addresses monitoring points at stationary-source air-emission and wastewater outlets, including technical requirements for their arrangement, information signs and point management. The announcement sets implementation for 1 January 2027. A historical review should keep the publication and implementation dates distinct.

For a new or upgraded installation, the layout of control equipment and discharge routes affects how monitoring personnel access the site. Monitoring points can therefore be included when coordinating ducts, outlets and surrounding space, with responsibility for locating, constructing and handing over each point established before installation is complete.

The standard concerns monitoring points and their management; it does not assign a universal sampling-port location to an equipment series. Projects should distinguish air from water outlets, identify individual discharge routes and monitoring tasks, then check the original requirements.

An equipment dimension drawing alone cannot establish that all outlet monitoring arrangements are in place; construction and access interfaces also need coordination.

02

Advice for factories

Prepare outlet lists, duct or drainage drawings, photographs of existing monitoring points and information about access conditions for joint review by designers and monitoring personnel. Define the point, signage and maintenance responsibilities in the upgrade plan, retaining the stated implementation date rather than treating publication as the completion deadline.

NEXT STEP

Send your duty, get a proposal

Continue