The Measure of Clean Air.

CASE STUDY

115,000 m³/h treatment for four melting furnaces

Four melting furnaces share a 115,000 m³/h treatment system using FMS/PTFE-membrane media for the recorded approximately 150°C gas condition.

Start with duty and result basis

Project profile

ItemRecorded information
SectorMetal melting
LocationProject location not disclosed
DutyFour furnaces; dry metal-oxide fume
Equipment and mediaCentral fume filtration; FMS plus PTFE membrane
System airflow115,000 m³/h
Gas and operationApproximately 150°C; 24-hour operating pattern
Design outlet target<10 mg/Nm³
Reported efficiency≥99.5%

Connect furnace capture to filter-inlet conditions

Charging, skimming and tapping have different release locations and thermal states. Capture must accommodate cranes and access. A multi-furnace network allocates flow to the actual operating combination and retains temperature/loading information from the furnace to the filter inlet.

The project records FMS/PTFE media and a 24-hour pattern. Continuous operation needs coordinated inlet conditions, media, cleaning, discharge and service arrangements, with operating records used to track peaks and deposits.

Connect multi-furnace figures to sustained operation

Below 10 mg/Nm³ is the original design outlet target; at least 99.5% is the efficiency stated in the project description. For a similar duty, define continuous/peak states, media and cleaning condition, measurement locations and maintenance together.

Similar furnace duties can compare SMC, SMB and SIB filter arrangements with suitable inlet conditioning. Separate particles, gases, hot material and site protection to allocate equipment, duct and specialist-system responsibilities.