115,000 m³/h treatment for four melting furnaces
Four melting furnaces share a 115,000 m³/h treatment system using FMS/PTFE-membrane media for the recorded approximately 150°C gas condition.
Start with duty and result basis
Project profile
| Item | Recorded information |
|---|---|
| Sector | Metal melting |
| Location | Project location not disclosed |
| Duty | Four furnaces; dry metal-oxide fume |
| Equipment and media | Central fume filtration; FMS plus PTFE membrane |
| System airflow | 115,000 m³/h |
| Gas and operation | Approximately 150°C; 24-hour operating pattern |
| Design outlet target | <10 mg/Nm³ |
| Reported efficiency | ≥99.5% |
Connect furnace capture to filter-inlet conditions
Charging, skimming and tapping have different release locations and thermal states. Capture must accommodate cranes and access. A multi-furnace network allocates flow to the actual operating combination and retains temperature/loading information from the furnace to the filter inlet.
The project records FMS/PTFE media and a 24-hour pattern. Continuous operation needs coordinated inlet conditions, media, cleaning, discharge and service arrangements, with operating records used to track peaks and deposits.
Connect multi-furnace figures to sustained operation
Below 10 mg/Nm³ is the original design outlet target; at least 99.5% is the efficiency stated in the project description. For a similar duty, define continuous/peak states, media and cleaning condition, measurement locations and maintenance together.
Similar furnace duties can compare SMC, SMB and SIB filter arrangements with suitable inlet conditioning. Separate particles, gases, hot material and site protection to allocate equipment, duct and specialist-system responsibilities.