20,000 m³/h extraction for aluminium-dust blasting
The blasting-machine duty is organized around aluminium dust, with a recorded system flow of 20,000 m³/h and a design outlet target below 10 mg/Nm³.
Start with duty and result basis
Project profile
| Item | Recorded information |
|---|---|
| Sector | Metal surface cleaning |
| Location | Project location not disclosed |
| Duty | Blasting machine with explosible aluminium dust |
| Equipment route | Blasting-dust extraction and specialist protection; original model not disclosed |
| System airflow | 20,000 m³/h |
| Design target | Particulate outlet target <10 mg/Nm³ |
Match blasting operation to aluminium-dust properties
Blasting involves the workpiece, abrasive and any removed coating. Capture follows machine doors, the blasting zone and loading; separation and filtration account for abrasive carry-over, wear and loading. Representative aluminium-dust information and protection interfaces belong in the specialist design.
This record states a 20,000 m³/h system. For a similar workstation, place the production interface, openings, cycle, abrasive recovery and dust-discharge paths on one drawing before defining the equipment and site connections.
Translate the design target into delivery conditions
Below 10 mg/Nm³ is the original design outlet target. Delivery documents should define material, gas-flow basis, filtration, cleaning, sampling location and duty, together with protection, electrical, discharge and maintenance responsibilities.
For a similar workstation, compare the complete system: stable capture, abrasive handling, service access and protection appropriate to the actual dust. Start with the blasting guide and then discuss bag or other particle-collection routes.